Which of the following item categories can you use in a Plant Maintenance bill of material (BOM)? (Choose two.)
- A. Functional location
- B. Equipment
- C. Non-stock material
- D. Stock material
- E. Assembly
Answer: C,D
NEW QUESTION 57
Which steps must you perform to enable the valuation of characteristics for a piece of equipment? (Choose three)
- A. Assign a class to the equipment category.
- B. Create characteristics in the classification system.
- C. Assign a class to a piece of equipment.
- D. Assign characteristics to a class.
- E. Assign characteristics to the equipment class type.
Answer: B,C,D
NEW QUESTION 58
Which of the following components is included in SAP Solution Manager?
Please choose the correct answer.
Response:
- A. Service Desk
- B. SAP NetWeaver Business Warehouse
- C. SAP NetWeaver Enterprise Search
- D. Master data management
Answer: A
NEW QUESTION 59
What is the definition of a Data Source?
- A. All available data of a business transaction type.
- B. A superordinate term for characteristics, key figures, and units.
- C. A superordinate term for BI objects that can be analyzed using BEx queries.
- D. An extraction structure for data transfer to SAP BusinessWarehouse.
Answer: D
NEW QUESTION 60
Which location object information is available?
Please choose the correct answer.
Response:
- A. In the notification
- B. Catalog
- C. Field
- D. Editor phase
Answer: A
NEW QUESTION 61
Plant maintenance strategies involve the following steps. Identify them
There are 3 correct answers to this question.
Response:
- A. BAT
- B. TPM
- C. CAA
- D. RBI
- E. RCM
Answer: B,D,E
NEW QUESTION 62
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?
Please choose the correct answer.
Response:
- A. Planned costs overwrite estimated costs after release of the order.
- B. Planned costs must not exceed the estimated costs.
- C. A specific order type in which cost estimates are activated must be used.
- D. Upon release of the order, estimated costs cannot be revised.
Answer: D
NEW QUESTION 63
What information does the value category provide in the maintenance order?
Please choose the correct answer.
Response:
- A. A summary of costs for multiple cost elements
- B. The costs by work center
- C. The material costs by valuation category
- D. The costs details for individual technical objects
Answer: A
NEW QUESTION 64
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
- A. Valuation categories
- B. Version for cost estimates
- C. Costing type
- D. Valuation variant
Answer: D
NEW QUESTION 65
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:
- A. Assign priorities to technical object master records.
- B. Assign a priority type to an order type.
- C. Assign a priority type to a technical object master record.
- D. Assign priorities to order types.
Answer: B
NEW QUESTION 66
The following entries are possible in the command field (Choose five.):
- A. From SAP Easy Access: search_sap_menu
- B. From SAP Easy Access: SM04
- C. /nend
- D. ?SM04
- E. /nex
- F. /nsm04
Answer: A,B,C,E,F
NEW QUESTION 67
Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.
In Customizing, how can you accomplish this requirement? (Choose two)
- A. By setting the indicators for the planning plant only
- B. By activating the operation selection indicator
- C. By setting the indicators for the order type only
- D. By activating the work center selection indicator
Answer: B,D
NEW QUESTION 68
How the settlement rule for suborder is to be determine in the Customizing setting for order type?
- A. Apply CATS
- B. Copy the main order as the settlement receiver
- C. Do not copy order
- D. None of the above
Answer: B
NEW QUESTION 69
A customer notices a volume is using an above average amount of Tier 1 RAID 10 space. What can be done to force this data into a lower RAID set/Tier?
- A. Take a manual snapshot
- B. Change the storage profile of the volume
- C. Move data to a different volume
- D. Stop I/O to the volume
Answer: A
NEW QUESTION 70
You have selected Confirmation Required in the control key for operations in a maintenance order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three)
- A. CNF
- B. CLSD
- C. CRTD
- D. TECO
- E. PCNF
Answer: B,D,E
NEW QUESTION 71
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
- A. REL (Released)
- B. ATCO (All Tasks Completed)
- C. NOCO (Notification Completed)
- D. TECO (Technically Completed)
Answer: C
NEW QUESTION 72
Which SC Series array feature allows all front-end ports to act as active data paths?
- A. ALUA
- B. Dual Fabric
- C. Legacy Port Mode
- D. Virtual Port Mode
Answer: D
Explanation:
Explanation/Reference: https://www.dell.com/storagehelp/dellstorageclient/2016R3/en-us/GUID-2D6A2482-F78D-4598- ADA3-D9E49ED3ED7F.html
NEW QUESTION 73
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?
- A. In a new, automatically created value category
- B. In the internal activity value category
- C. In the overhead value category
- D. In the unassigned value category
Answer: D
NEW QUESTION 74
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
Please choose the correct answer.
Response:
- A. Valuation categories
- B. Version for cost estimates
- C. Costing type
- D. Valuation variant
Answer: D
NEW QUESTION 75
What are the three organizational levels?
There are 3 correct answers to this question.
Response:
- A. Assign
- B. Analyze
- C. Damage
- D. Define
- E. Collect
Answer: A,B,D
NEW QUESTION 76
For which business requirements must you use serial numbers? (Choose two)
- A. To have a future option to track material items as pieces of equipment
- B. To have the option to track batches
- C. To have a future option to track material items as pieces of functional locations
- D. To uniquely identify inventory material items
Answer: A,D