C_IBP_2208 Dumps To Pass SAP Exam in 24 Hours - Exam4Tests [Q16-Q34]

Share

C_IBP_2208 Dumps To Pass SAP Exam in 24 Hours - Exam4Tests

Buy Latest C_IBP_2208 Exam Q&A PDF - One Year Free Update


SAP C_IBP_2208 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe how IBP extends the logic of S&OP in the network using advanced demand
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
Topic 2
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Configure supply planning, run various solvers to generate planning result
Topic 3
  • Create statistical forecast using historical data with basic methods
  • Supply planning integrated with financial plans
Topic 4
  • Display, create, copy, edit, check, and activate a planning area
  • Planning Operators & Application Jobs

 

NEW QUESTION 16
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Target key figures for these snapshots are exposed to the user in planning views.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.

Answer: C,D

 

NEW QUESTION 17
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • B. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • C. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • D. IF("PERIODID3" ="$$PERIODID3CU$$...)

Answer: A

 

NEW QUESTION 18
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.

  • A. Simulate heuristics run in Supply Review stage
  • B. Simulate demand sensing inputs for Supply Review
  • C. Model inventory turns based on Target Safety stocks
  • D. Simulate statistical forecast at the Demand Review stage

Answer: A,D

 

NEW QUESTION 19
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?

  • A. Download the Initial Problem Report in the Data Integration app.
  • B. Navigate to the Manage Master Data app and open the Log.
  • C. Download the Rejection Report in the Data Integration app.
  • D. Navigate to the Master Data Workbook in Excel and open the Log.

Answer: B

 

NEW QUESTION 20
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.

  • A. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • B. Both periods and profiles have start and end dates.
  • C. Both periods and profiles are identified by a unique integer.
  • D. Periods are identified by an alphanumeric prefix and profiles by an integer.

Answer: A,D

 

NEW QUESTION 21
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.

  • A. Search for and return the last not null value of the inventory key figure
  • B. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
  • C. Calculating how many periods inventory is going to last based on the planned demand
  • D. Calculating the value of inventory on any time profile level ensuring flexibility of calculation

Answer: A,C

 

NEW QUESTION 22
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
  • B. Splitting the values from detailed to aggregated level by using a copy operator
  • C. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • D. Splitting the values from aggregated to detailed level, based on the time profile attribute

Answer: A,C

 

NEW QUESTION 23
Forecast Error CV is an input to which of the following?

  • A. Multistage Inventory Optimization in Inventory Planning Profile Operator
  • B. Time-Series-Based Supply Planning Optimizer
  • C. Forecast Error Calculation in Inventory Planning Profile Operator
  • D. Calculate Target Inventory Components in Inventory Planning Profile Operator

Answer: A

 

NEW QUESTION 24
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.

  • A. The S&OP process step can be started with an application job.
  • B. All process templates are assigned to dashboards.
  • C. Each step depicted in the template can have tasks associated with it.
  • D. New instances of templates allow for re-use of the same processes.

Answer: C,D

 

NEW QUESTION 25
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.

  • A. Demand Sensing with Gradient Boosting (Full)
  • B. Supply Heuristics in SAP IBP for sales and operations
  • C. Charts creation in SAP Supply Chain Control Tower
  • D. Decoupling Points determination in SAP IBP for demand-driven replenishment

Answer: A,B

 

NEW QUESTION 26
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Holding Cost Percentage
  • B. Target Service Level
  • C. Transportation Lead Time Error CV
  • D. Minimum Lot Size

Answer: B,D

 

NEW QUESTION 27
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. If necessary target key figures values are disaggregated.
  • B. Copying multiple key figures on different planning levels is not possible.
  • C. Copying multiple key figures can be processed sequentially.
  • D. If necessary source key figures values are disaggregated.

Answer: C,D

 

NEW QUESTION 28
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.

  • A. Target Pipeline Stock
  • B. Component Usage
  • C. Recommended Safety Stock
  • D. Target Cycle Stock
  • E. Reorder Point

Answer: A,C,D

 

NEW QUESTION 29
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is calculated and system editable.
  • B. The key figure is stored and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is stored and all editable.

Answer: D

 

NEW QUESTION 30
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

  • A. Use drill-down functionality.
  • B. Display all assigned analytics on a single UI.
  • C. Link two analytics charts.
  • D. Rename the charts.
  • E. Add process templates.

Answer: A,B,E

 

NEW QUESTION 31
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.

  • A. To filter using attributes that have a large number of values
  • B. To filter attributes based on other attribute filters
  • C. To filter data in an Application Job template
  • D. To filter attributes based on specific values

Answer: A,D

 

NEW QUESTION 32
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the required planning level master data exists for a subset of input key figures.
  • B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • C. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
  • D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • E. It checks whether the sourcing in the Production Source Item Master Data type exists.

Answer: A,B,C

 

NEW QUESTION 33
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the description of the attributes in the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the numbering hierarchy of the period IDs in the time profile.
  • D. Add a new time profile level to the time profile.

Answer: A,B

 

NEW QUESTION 34
......

Download the Latest C_IBP_2208 Dump - 2023 C_IBP_2208 Exam Question Bank: https://www.exam4tests.com/C_IBP_2208-valid-braindumps.html

Latest SAP C_IBP_2208 Certification Practice Test Questions: https://drive.google.com/open?id=1-QObsYoizI_-oKI4bvNjXwh0o8RBHHbw