NEW QUESTION 48
Which of the following is NOT true?

  • A. Multiple calendars can affect the total float calculation.
  • B. Remaining durations can exceed original durations.
  • C. A network must contain only one Critical Path.
  • D. Constraints can interfere with the longest path calculation.

Answer: B

 

NEW QUESTION 49
What is the primary difference between the arrow diagramming method (ADM) and the precedence diagramming method (PDM)?

  • A. ADM is limited to finish-to-start logic relationships, while PDM is not.
  • B. PDM is a bar chart with network logic, while ADM is a pure logic network.
  • C. ADM uses arrows, while PDM uses boxes.
  • D. ADM is manual CPM calculations, while PDM is computerized.

Answer: A

 

NEW QUESTION 50
Which of the following is NOT required when performing weekly or monthly schedule updates?

  • A. Original duration of activities.
  • B. Actual finish of activities.
  • C. Percent complete.
  • D. Remaining duration of activities.

Answer: D

 

NEW QUESTION 51
Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing "no differing sit conditions" and "no damage for delay" clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
"normal" schedule and $3,200 for the "crashed" schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor's operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the "normal" schedule, what is the cost of this hammock?

  • A. $420,000.
  • B. $524,000.
  • C. $552,000.
  • D. $307,000.

Answer: C

 

NEW QUESTION 52
How could the structural steel drawing delay have been prevented?

  • A. Release the structural steel for fabrication concurrent with review of structural steel shop drawings.
  • B. Allow adequate time for review and resubmittal in the baseline schedule.
  • C. Switch to post-tensioned concrete construction.
  • D. Add a time buffer at the end of structural steel activities.

Answer: D

 

NEW QUESTION 53
Determine the correct formula and date for the late finish for Activity 9004.

  • A. LS.10002 - 1 day -> 11-27-03.
  • B. LS.10002 - Lag.7 - l day -> 11-20-03.
  • C. LS.10002 + 1 day -> 11-29-03.
  • D. LS.10002^ Lag.7 + i day -> 11-20-03.

Answer: D

 

NEW QUESTION 54
What method offers the best chance of the schedule being used effectively to implement the project in the field?

  • A. Obtain consent and agreement to the schedule from the key project personnel.
  • B. Include detailed and stringent set of scheduling specifications in the contract.
  • C. Issue detailed schedule updates as frequently as possible.
  • D. Allow large time contingencies on milestones and completion deadlines.

Answer: A

 

NEW QUESTION 55
Determine the correct formula and date for the late start for Activity 9001.

  • A. LS.6001 Dur.6001 -> 11-20-02.
  • B. LF.9001 Dur.9001 -> 11-20-02.
  • C. The early finish is required in order to determine the answer.
  • D. There is insufficient data provided to calculate the answer.

Answer: B

 

NEW QUESTION 56
Which of the following will always describe the critical path? The path with

  • A. Zero float.
  • B. The longest duration through the network.
  • C. Negative float.
  • D. The shortest duration and negative float.

Answer: A

 

NEW QUESTION 57
Resource planning must take all of the following into account except for

  • A. Types of materials, equipment and labor skills required to complete the project.
  • B. Earned value techniques established for the project.
  • C. Time available to complete the project.
  • D. Cash flow (expenditure) limitations for completing work on the project.

Answer: B

 

NEW QUESTION 58
What is the actual duration as of the status date or data date of Activity B?

  • A. 4.
  • B. 7.
  • C. 0.
  • D. 3.

Answer: D

 

NEW QUESTION 59
By subtracting a measured unit productivity rate during an impacted period from the unit productivity rate during an unimpacted period, the resulting value represents:

  • A. Production output.
  • B. Acceleration.
  • C. Productivity loss.
  • D. Productivity efficiency.

Answer: C

 

NEW QUESTION 60
What was the original planned duration for Activity A through Activity G?

  • A. 25.
  • B. 24.
  • C. 26.
  • D. 28.

Answer: D

 

NEW QUESTION 61
Which of the following project planning situations is the most frequent contributor to cost overruns?

  • A. Insufficient planning for change management
  • B. Inadequate definition of scope at the estimate (budget) stage
  • C. Inappropriate definition of work breakdown structure
  • D. lack of detailed planning for operational start-up

Answer: B

 

NEW QUESTION 62
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?

  • A. 91 days
  • B. 168 days
  • C. 193 days
  • D. 183 days

Answer: D

 

NEW QUESTION 63
Theoretically construct a summary activity for activities 6001 through 6003. Identify the governing predecessor and successor activities for the hammock:

  • A. Predecessor is activity 5001, successor is activity 8001
  • B. Predecessor is activity 5001, successor is activity 8002
  • C. Predecessor is activity 4001, successor is activity 8001
  • D. Predecessor is activity 9001, successor is activity 9002

Answer: A

 

NEW QUESTION 64
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

  • A. 50 lifts
  • B. 80 lifts
  • C. 5 lifts
  • D. 20 lifts

Answer: A

 

NEW QUESTION 65
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?

  • A. Front end loading.
  • B. Preferential logic.
  • C. Multiple calendars.
  • D. Start and finish constraints.

Answer: A

 

NEW QUESTION 66
What is the relationship depicted between Activity G and Activity H?

  • A. You cannot tell with the supplied information.
  • B. Start-to-start.
  • C. Finish-to-finish.
  • D. Finish-to-start.

Answer: B

 

NEW QUESTION 67
Why does activity 11001 not show successor activities?

  • A. The early finish and late finish are circular
  • B. It is the penultimate work required for the project
  • C. The scheduler forgot to add the successor activities
  • D. It is the final activity for the required work for the project

Answer: D

 

NEW QUESTION 68
Determine the driving activity for Activity 10001.

  • A. Activity 11001.
  • B. Activity 10002.
  • C. Activity 9005.
  • D. There is no driving activity for Activity 10001 in the backward pass.

Answer: B

 

NEW QUESTION 69
......


Difficulty in Writing Planning & Scheduling Professional (PSP) Exam

All exams can turn out to be very difficult if not well prepared. The main preparation material for the Planning & Scheduling Professional (PSP) Exam is the industry experience and related college degree as this is the prerequisite of the exam and is a must for an applicant as stated by AACE. Refer to the “How to study” section above to use the official resources to best prepare for the exam. One of the key problems faced by most candidates is to choose the right research materials for their exam preparation since they use the internet to find too much data that makes it difficult for them to trust, which would be helpful for them. PSP dumps pdf are designed in such a way to make better preparatory material. This exam can turn out to be a very difficult certification if not well prepared. We always recommend studying the PSP practice dumps before actually appearing for the exam. Applicants may, however, clear the exam with the right concentration and the right preparation material.

Exam4Tests have the most up-to-date PSP exam dumps, having a fair understanding of the question trend being asked in real certification with the help of these dumps.

 

AACE-PSP Real Exam Questions and Answers FREE: https://www.exam4tests.com/AACE-PSP-valid-braindumps.html

2022 Realistic Verified Free AACE International AACE-PSP Exam Questions : https://drive.google.com/open?id=1XzDp2z9wmHUB8z1CACKSJBr12E0PxzFS