NEW QUESTION 75
Which of the following should be noted for the storage of goods? (Multiple choice)

  • A. Floor load should meet the requirements
  • B. Cannot be stored outdoors
  • C. Meet the stacking limit layer number requirement
  • D. Does not affect the fire exit

Answer: A,B,C,D

 

NEW QUESTION 76
There must be no connectors in the middle of the protective ground wire. It is strictly forbidden to install switches or fuses on the protective earth wire.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 77
The N63E-22 indoor cabinet can be installed on the anti-static floor.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 78
After the OceanStor V3 is powered on, the power indicator on the controller enclosure is flashing green.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 79
Which of the following is the abbreviation fiber to the home?

  • A. FTTD
  • B. FTTC
  • C. FTTB
  • D. FTTH

Answer: D

 

NEW QUESTION 80
Which chassis can be installed on the N63E-22? (Multiple Choice)

  • A. MA5800-X2 chassis
  • B. MA5683T chassis
  • C. MA5608T chassis
  • D. MA5800-X17 ETSI chassis

Answer: A,B,C,D

 

NEW QUESTION 81
Which of the requirements must be observed by construction workers belonging to special types of work (eg, work at heights, electricians, welders, etc.)?

  • A. Only need to pass the prescribed safety technology training assessment, no certificate required
  • B. Pass the prescribed safety technology training and assessment, and hold the corresponding employment certificate
  • C. Very experienced, no training and employment permits are required.

Answer: B

 

NEW QUESTION 82
MA5800 box series, which of the following statements about the environment confirmation are correct? (Multiple choice)

  • A. Need to confirm that the DC voltage provided by the equipment room should be -38.4V~-57.6V
  • B. Confirm that the ODF or MDF has been installed.
  • C. No need to prepare tool and instrument
  • D. Confirm that the equipment grounding bar has been installed.

Answer: A,B,D

 

NEW QUESTION 83
The front and back floors of the cabinet where the server is installed need to have an open ventilation floor.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 84
Vehicle safety does not need to be checked before each drive.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 85
Regarding power-on and power-off, which of the following statements is correct? (Multiple Choice)

  • A. Please wait at least 1 minute after turning off the power, then turn the power back on.
  • B. Do not plug or unplug cables and FRU (Reid Replaceable Unit) modules during power-on, otherwise data may be lost.
  • C. After turning off the power, you can turn it back on immediately.
  • D. Do not cut off the power before the hard disk running indicator stops flashing to avoid damage to the hard disk and data loss.

Answer: A,B,D

 

NEW QUESTION 86
Which one is not a typical product for copper access?

  • A. DSL terminal: such as HG630
  • B. MSAN: such as UA5000
  • C. ONT: such as HG8145C
  • D. DSLAM: such as MA5600

Answer: C

 

NEW QUESTION 87
When hoisting manually, which one should be limited to the personal capacity of the hoisting personnel?

  • A. Less than 5 kg
  • B. Less than 20 kg
  • C. Less than 50 kg
  • D. Less than 40 kg

Answer: B

 

NEW QUESTION 88
When the ground wire and power cable are connected to the power cabinet, the excess length can be coiled.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 89
After the cabinet is unpacked, the forklift can be used to carry and lift the steps if necessary.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 90
......