Unique Top-selling HPE6-A80 Exams - New 2022 HP Pratice Exam [Q31-Q53]

Share

Unique Top-selling HPE6-A80 Exams - New 2022 HP Pratice Exam

Aruba Certified Design Expert (ACDX) Dumps HPE6-A80 Exam for Full Questions - Exam Study Guide

NEW QUESTION 31
Refer to the exhibit.
A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh environments that require more than 45 W to function, Which exhibit shows an access switch mat meets the customer needs?
A)

B)

C)

D)

  • A. Option C
  • B. Option B
  • C. Option A
  • D. Option D

Answer: D

 

NEW QUESTION 32
Refer to the exhibit.

The network architect has created the 60M shown in the exhibit tor a complete new wired ana wireless solution for a customer. This solution the customer wants to discover and manage every component or the network in Airwave, including twins, MCS, APS, and switches.
How many AirWave licenses dees the architect need to add?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 33
Refer to the exhibit.

A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000 square root (isr580 sq. m) are a. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?

  • A. Add two Maps subscriptions.
  • B. Remove one Blue Dot Nav subscription.
  • C. Add another campaign subscription.
  • D. Change the campaign subscription to a Maps subscription.

Answer: D

 

NEW QUESTION 34
Refer to the exhibit.

The exhibit shows the current AP deployment in a school. This customer indicates that the current wireless performance is inadequate and w B02.11ax.
For the new' solution, what should the network architect recommend?

  • A. APS deployed in similar locations, but with higher gain antennas
  • B. APs deployed in rooms with a density-based design
  • C. APs deployed in hallways with about twice the density
  • D. APs deployed in similar locations, but with dual 5 GHz radios

Answer: C

 

NEW QUESTION 35
A retail customer is doing a wired and a wireless refresh with Arut>a CX switches and S02.11ax APs. Currently, trey nave wireless Point of Sales (PoS) systems and would like to assure that the proposed deployment solution will comply with the Payment Card Industry (PCI) Data Security Standard (DSS) requirements.
The architect have proposed the following deployment solutions regarding PCI DSS requirements'
-IDS/IPS
-Aruba APs in hybrid mode as well as in dedicated AMs mode
-Strong authentication and encryption for wireless
-Built-in firewall and role-based access controls to segment WLAN
Which other requirements must you include in the existing deployment solution? (Select two.)

  • A. Role-based access controls for wired users using ClearPass. Optionally ; tunneled-node to MCs.
  • B. Aruba Central or Aruba AirWave to generate a scheduled compliance reporting.
  • C. Switch high-availability solution VSF and VSX also can encrypt all traffic on their switch links.
  • D. Suggest MACSet between the Aruba CX switches that encrypt all traffic over the link.
  • E. Select the FIPS/TAA-compliant version for the Access Points.

Answer: A,B

 

NEW QUESTION 36
An indoor sports stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of 72 feet (22 m).
* There is a catwalk around the perimeter of me stadium that is 54 feet (13 m) from me floor.
* There are two scoreboards at either end of the stadium
* The construction of the stadium is concrete and steel.
The customer has indicated a preference for overhead coverage, and the wireless network should support 3500 concurrent clients. The architect plans to install the APs on the catwalk to service sections of the floor below Which type or antennas are recommended for the APS that provide the overhead coverage?

  • A. vagi
  • B. high gain omnidirectional
  • C. high gain directional
  • D. downtilt

Answer: C

 

NEW QUESTION 37
Refer to the exhibit.

A customer has the wined infrastructure shown in the exhibit. The customer is in the process of expanding their wireless services They will now add a new wireless solution, with mobility controllers (MCs) connected as shown. The new wireless solution will support a total of 450 APs and about 26,000 wireless devices. It must provide seamless roaming across the entire campus.
After the new deployment, both wired and wireless devices experience IP connectivity issues.
Which change to the existing infrastructure should the architect recommend to support all of the customer requirements?

  • A. The core and aggregation switches should disable Virtual Switching Framework (VSF).
  • B. The core switches should be replaced with switches that have larger ARP tables.
  • C. The MCs should be moved to the aggregation layer, and more MCs added
  • D. The wired VLANS should be combined into a single VLAN and n6 subnet

Answer: A

 

NEW QUESTION 38
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?

  • A. The 7240XM MCs have better redundant power supplies and fan tray component capabilities than 7220 MCs.
  • B. The 7240XM MCs are required to support the large number of wireless clients in this network
  • C. The 724QXM MCs can support full CPSec tunnels with this number of APs. while the 7220 MCs cannot.
  • D. The 7240XM MCS provide a higher number of concurrent GRE tunnels to support 600APs with MCS in L2 clustering.

Answer: B

 

NEW QUESTION 39
A customer has an existing; Aruba wireless solution to provide wireless access for employees. The solution Includes Aps, mobility controllers (MCs) at the network core, and a Mobility Master (MM} A customer would like to set up a separatelymanaged guest network and have the traffic go directly to the DMZ.
What should the architect suggest as the simplest solution that meets the requirements?

  • A. Double the number of APs and controllers.
  • B. Use MulitZone, and put a mobility controller in Itie DMZ.
  • C. Have a dedicated mobility controller in the DMZ managed by the same MM
  • D. Add APs in a dedicated AP group to support only the guest network SSID.

Answer: B

 

NEW QUESTION 40
A nospltai needs an upgrade to 802.11ax for its wireless network, which needs to provide complete coverage The hospital has a concrete exterior and uses drywalls lor all of the interior walls with a few exceptions as mandated for safety The building has 10fool (3 m) ceilings.
The hospital prefers to avoid the deployment of APs in rooms if possible. Exceptions include reception areas and lounges.
The wireless network must support wireless medical devices, voice communicators for medical star, laptops in nurse stations, medical staff tablets, and visitor and patient personal devices. All of these devices support both the 2.4GHz and 5GHz band.
The exhibits below show one wing of one floor of the hospital. This wing is about 2S.Q0D square feet {2GQQ sq, m). The unlabeled rooms along the bottom of the wing are patient rooms' other rooms such as lounges and the MR] room are labeled. This area has:
* up to SO concurrent patients and visitors, who might have up to two devices
* 40 concurrent staff members, who might have up to three devices
* about 200 medical and other types of wireless devices
The architect has already planned to place APs in stairwells on another floor.
Which AP plan for this wing of this floor meets the customer needs?
A)

B)

C)

D)

  • A. Option D
  • B. Option C
  • C. Option B
  • D. Option A

Answer: D

 

NEW QUESTION 41
Refer to the exhibit.

A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?

  • A. Add a wiring closet closer to the north side.
  • B. Use directional antennas to avoid lost signal.
  • C. Add about 10 APs to achieve adequate density
  • D. Use at least CATS cable to connect to the APs.

Answer: A

 

NEW QUESTION 42
An archinect needs lo plan a Mobility Master (MM) solution for a customer Requirements include:
* redundancy for the MM
* redundancy for the MCS (seamless failover if up to one fails)
The wireless network consists of
* total APs - 300
* total wireless devices = 20,000
* total MCs = 10
The customer wants the most cost-effective plan that meets me requirements.
Which plan for MMs should the architect select?

  • A. 2 MM-HW-1QK
  • B. 1 MM-HW-5K and 1 MM-HW-1K
  • C. 1 MM-HW-5K and 1 MM-VA-1K
  • D. 2 MM-HW-5K

Answer: A

 

NEW QUESTION 43
Match each hospital room with a potential issue for the AP design (Each match will be used once. )

Answer:

Explanation:

 

NEW QUESTION 44
A retailer wants to add a wireless network to its stores to provide guest access. The store has wired POS systems which the customer will now replace with wireless systems.
The APs will he installed on the ceilings, which are about S feel (2.4 m) high.
What is one feature on the APs that can help the customer comply with PCI DSS?

  • A. User and Entity Behavior Analytics (UEBA)
  • B. Physical security with Kensington Security Slots
  • C. Smart Rate ports
  • D. Anomaly-based threat detection

Answer: C

 

NEW QUESTION 45
in which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?

  • A. The customer requires switches in the same closet to operate together as a single switch for Link Aggregation but to be managed as separate devices.
  • B. The customer has recently deployed Aruba AP-535 APs and is concerned about a future-proof wired edge that will continue to support expanding bandwidth requirements.
  • C. The customer requires each access layer switch to support at least 25Gbps on its fiber uplinks at all times; including if up to one uplink tails.
  • D. The customer requires enhanced redundancy at the access layer and wants to ensure that each switch can continue to operate even if a power supply fails

Answer: A

 

NEW QUESTION 46
A company already has an Aruba wireless network The network currently consists of:
* oneMM-HW-1k
* two 7210 MCs in the network core
* two 721GMCsintheDMZ
* 200 AP-515S in Building 1 and Building 5
100 AP-515S each In Building 2r Building 3, and Building 4
The customer now wants to assess if it needs local Mobility controllers (MC) for any buildings:
- Building 1 is the main office building for the campus. It supports the highest number of APs. It connects to the network core without an aggregation layer.
* Building 2 is further away from the Building i. and no roaming is provided between it and the other buildings its access layer connects to the network cone with a pair of Aruba CX 6300M aggregation switches.
* Building 3 is further away from the other buildings, it connects to the network core without an aggregation layer.
The Guest SSID traffic should be tunnelled to the DMZ controllers
' Building 4 has its own local datacenter and Internet connection. The company would like it to be able to operate completely autonomously if its aggregation layer loses connectivity with the core.
* Building 5 is further away from the other buildings, it connects to the network core without an aggregation layer.
This building has been assigned to a partner that would like to manage a dedicated SS1D using the shared AP infrastructure.
In which two buildings should the network architect plan local mobility controllers (MCs)? (Select two)

  • A. Building 3
  • B. Building 5
  • C. Building 1
  • D. Building 4
  • E. Building 2

Answer: A,C

 

NEW QUESTION 47
Which scenario Indicates the need for a wireless mesh?

  • A. A hospital needs to provide high availability for wireless services in certain areas which support very critical wireless medical devices. Devices must always be in range of at least two APs.
  • B. A nsstorical building has some wired areas and a few areas with no wired or wireless connectivity, walls and ceilings have asbestos. The company needs wireless access across the site.
  • C. A company has a small branch office with just one RAP. The company has noticed that performance is poor in some areas of the network and wants to add another AP.
  • D. A company needs to provide seamless roaming and wireless access between two buildings. The buildings are about 60 feet (18 m) apart.

Answer: D

 

NEW QUESTION 48
Refer to the exhibit.

A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that the architect has selected for each closet and me existing cabling. The customer is not open to changing the cabling.
The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations Which two options Tor connecting the closets to the network core are valid? (select two.)

  • A. Combine the nine switches on all three floors into a single switch slack with stacking cables in a ring topology.
    Connect two Floor f members to the network core with one fiber connection each
  • B. Add two aggregation switches in the Floor 1closet. Connect the switch stack for each closet to the aggregation switches on two fiber links each and the aggregation switches to the core on two fiber links.
  • C. Connect the switch stack on each floor directly to the network cone on two "fiber connections per floor. Achieve this by patching the inter-floor fiber through to the inter-building fiber.
  • D. Combine the nine switches on the three floors into a single switch stack with the MM QM3 fiber cables in a ring topology. Connect two Floor 1 members to the network core with one fiber connection each.
  • E. Connect me Floor 2 switch stack to Floor 1 with two fiber connections, DO me same for Floor 3. connect the Floor 1 switch stack to the network cone with two fiber connections.

Answer: B,C

 

NEW QUESTION 49
Refer to exhibit.

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?

  • A. Add a mode conditioning cable for each link between the wiring closet switches and the network core.
  • B. Add an aggregation layer, and connect wiring closet switches to the aggregation layer with SFP+- SR transceivers
  • C. Change the SR transceivers tor each link between the wiring closet switches and me network core to LRM transceivers
  • D. Add an aggregation layer, and connect wiring closet switches to the aggregation layer on Smart Rate pons.

Answer: A

 

NEW QUESTION 50
A retailer currently has two redundant ClearPass C2000 0L36O Gen9 hardware appliances and two perpetual 1K Access licenses. The customer uses ClearPass to authenticate employee wireless devices and other corporate wireless devices. ClearPass togs indicate that, peak license usage is currently 1900.
The customer now wants to add a guest access solution. Guests will connect to an open SSiD and be redirected to a portal which they can use to self-register and log in. The customer anticipates that up to f 550 guest devices will connect at the same time.
The customer requires the most cost-effective solution that will meet the requirements. What should the network architect recommend for this solution?

  • A. 1K + 500 Access licenses
  • B. Two 1K Guest licenses
  • C. 1K + 500 Access licenses; Two 1K Onboard licenses
  • D. IK + 500 Access licenses: IK + 500 Guest licenses

Answer: B

 

NEW QUESTION 51
A customer has an Aruba wireless network. which includes two MC 7205s and an MM at the network core. The company now wants to accommodate 50 mobile trainers These trainers travel around the world and run training events. The trainers often need to access materials in the company data center, but cannot reach materials when they are on the road.
The company wants to give the mobile workforce a secure way to reach the materials they need no matter where they are.
including in public spaces like the hotels where they often leach. The customer also requires that the solution be as cost effective as possible while meeting the requirements.
Which plan meets the needs of the mobile Trainers?

  • A. Add 50 VIA licenses to the MM, and deploy two 7005 MCs in the DMZ.
  • B. Add 50 RAPs: add 50 Enterprise licenses to the MM, and add two 7005 MCs in the DMZ.
  • C. Add so PEFV licenses to the MM. and add an additional 7205 MC to the core.
  • D. Add 50 RAPs; add 50 Enterprise licenses and 50 VIA licenses to the MM

Answer: D

 

NEW QUESTION 52
An indoor basKetbaiI stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of GO feet (18 m).
* There is a catwalk around the perimeter of the basketball court, between the court and the seating areas.
* This catwalk is 40 feet (12 m) from the floor.
* There are two scoreboards at either end of the stadium.
* The construction of the stadium is concrete and sleet.
The customer does not want an under-seat, picoceli deployment.
Which AP model is appropriate to provide coverage in the main stadium bawl?

  • A. AP-577
  • B. AP-505
  • C. AP-555
  • D. AP-575

Answer: A

 

NEW QUESTION 53
......

Best way to practice test for HP HPE6-A80: https://www.exam4tests.com/HPE6-A80-valid-braindumps.html