[Mar-2023] Get 100% Real C_TS422_1909 Free Online Practice Test [Q50-Q74]

Share

[Mar-2023] Get 100% Real C_TS422_1909 Free Online Practice Test

BEST Verified SAP C_TS422_1909 Exam Questions (2023) 


C_TS422_1909 Exam Certification Details:

Sample Questions: SAP C_TS422_1909 Exam Sample Question
Duration:180 mins
Exam:80 questions
Level:Associate


SAP C_TS422_1909 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).



SAP C_TS422_1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

NEW QUESTION 50
Which of the following apply to MRP Live?
There are 2 correct answers to this question.
Response:

  • A. Planned orders need to be converted to purchase requisitions for externally procured materials.
  • B. The sequence of planning materials is calculated across plants.
  • C. The definition of the planning scope is more flexible.
  • D. The BAdIs for classical MRP also apply to MRP Live.

Answer: B,C

 

NEW QUESTION 51
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Capacity Requirements Planning (CRP)
  • B. Supply Network Planning (SNP)
  • C. Demand Planning (DP)
  • D. Material Requirements Planning (MRP)

Answer: D

 

NEW QUESTION 52
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive offset time in the strategy profile.
  • B. Specify a negative offset time in the strategy profile.
  • C. Specify a positive planning horizon in the strategy profile.
  • D. Specify a negative planning horizon in the strategy profile.

Answer: B

 

NEW QUESTION 53
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

  • A. Maximum allowed low-level code
  • B. Default unit of measure
  • C. Allowed material type
  • D. Default values for the item status

Answer: C

 

NEW QUESTION 54
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:

  • A. Stock transfers
  • B. Planned orders
  • C. Transfers from batch to batch
  • D. Purchase orders
  • E. Collective orders

Answer: A,C,D

 

NEW QUESTION 55
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To increase the number of planning levels
  • B. To make the assignment of components easier
  • C. To simplify the structure of bills of material
  • D. To reduce the number of changes required in bills of material
  • E. To reduce the number of material masters

Answer: B,C,D

 

NEW QUESTION 56
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:

  • A. The Individual/Collective indicator of the component
  • B. The item category of the component in the BOM
  • C. The MRP Type of the component
  • D. The Planning Strategy of the finished product

Answer: D

 

NEW QUESTION 57
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a transportation resource in the location master.
  • B. Model a resource inbound in the location master.
  • C. Model a handling resource in the location master and goods receipt time in the mater all master.
  • D. Model a separate resource in the production data structure.

Answer: A,C

 

NEW QUESTION 58
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:

  • A. The checking group from the material master
  • B. The ATP category for restricted-use stock
  • C. The checking rule from the business application
  • D. The checking control for the order type

Answer: A,C

 

NEW QUESTION 59
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP type
  • D. MRP group

Answer: B

 

NEW QUESTION 60
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 61
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Individual conversion
  • B. Order release
  • C. Full conversion
  • D. Partial conversion

Answer: C,D

 

NEW QUESTION 62
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:

  • A. A firmed planned receipt cannot be rescheduled
  • B. The requirements date occurs that of a firmed planned receipt
  • C. The requirement no longer exists
  • D. The requirements date occurs before that of a firmed planned receipt

Answer: D

 

NEW QUESTION 63
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, release, scheduling, material withdrawal, confirmation
  • B. Creation, scheduling, release, material withdrawal, confirmation
  • C. Creation, staging, release, material withdrawal, confirmation
  • D. Creation, scheduling, release, variance calculation, confirmation

Answer: B

 

NEW QUESTION 64
Which task list types can have parallel sequences?
There are 2 correct answers to this question.
Response:

  • A. Routings (N)
  • B. Reference operation sets (S)
  • C. Master recipes (2)
  • D. Rate routings (R)

Answer: A,D

 

NEW QUESTION 65
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the special procurement key of the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the item category of the phantom assembly in the BOM.

Answer: B

 

NEW QUESTION 66
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Orders (dispatched) chart
  • C. Order (pool) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 67
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Outbound delivery request
  • B. Outbound delivery order
  • C. Warehouse order
  • D. Warehouse task

Answer: A

 

NEW QUESTION 68
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Tear down time
  • B. Move time
  • C. Queue time
  • D. Processing time
  • E. Floating time

Answer: B,C,E

 

NEW QUESTION 69
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Production time
  • B. Minimum wait time
  • C. Queue time
  • D. Goods receipt processing time

Answer: C

 

NEW QUESTION 70
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Pick/pack time
  • B. Float before production
  • C. Wait time
  • D. Move time
  • E. Queue time

Answer: A,C,E

 

NEW QUESTION 71
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • B. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • C. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: C

 

NEW QUESTION 72
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. When you need to determine the work in progress
  • B. For production lines with short lead times
  • C. You require an up-to-date inventory for components
  • D. When goods issues can wait for final confirmation

Answer: A,D

 

NEW QUESTION 73
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:

  • A. Routing
  • B. Engineering Change Record
  • C. Production Version
  • D. Bill of Material

Answer: A,C,D

 

NEW QUESTION 74
......

C_TS422_1909 Exam Dumps, Practice Test Questions BUNDLE PACK: https://www.exam4tests.com/C_TS422_1909-valid-braindumps.html