
SAP Certified Application Associate C_TS422_1909 Real Exam Questions and Answers FREE Updated on Jan 23, 2022
C_TS422_1909 Ultimate Study Guide - Exam4Tests
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C_TS422_1909 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
NEW QUESTION 43
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product stability
- B. Low product complexity
- C. Low product stability
- D. High product complexity
Answer: A,B
NEW QUESTION 44
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Routing
- B. Repetitive manufacturing profile
- C. Production cost collector
- D. Production version
Answer: A,D
NEW QUESTION 45
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
- A. Individual control recipes
- B. Individual process instructions
- C. Individual operations
- D. Individual phases
Answer: C,D
NEW QUESTION 46
How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.
Response:
- A. Reorganize planned independent requirements
- B. Maintain adjustment parameter in the MRP group
- C. Use a planning strategy with requirements consumption
- D. Set the requirements reduction indicator in the requirements class
Answer: A,B
NEW QUESTION 47
What is the difference between co-products and by-products?
- A. Only by-products have a zero inventory valuation.
- B. Only co-products are identified by a special item category in the bill of material (BOM).
- C. Only co-products appear in the process or production order settlement rule.
- D. Only co-products can be manufactured in isolation from the main product.
Answer: C
NEW QUESTION 48
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the MRP type for vendor managed inventory.
- B. Use the fixed lot size procedure.
- C. Use the reorder point.
- D. Use the minimum order quantity.
Answer: B
NEW QUESTION 49
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Kanban
- B. Production order release
- C. Material requirements planning
- D. Back flushing
Answer: C
NEW QUESTION 50
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Insert operation
- B. Find Slot
- C. Scheduling working time only
- D. Squeezing
Answer: B
NEW QUESTION 51
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> Plant Settings -> MRP Group
- B. MRP Group -> Material Master -> Plant Settings
- C. Plant Settings -> MRP Group -> Material Master
- D. Material Master -> MRP Group -> Plant Settings
Answer: D
NEW QUESTION 52
What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:
- A. The OLAP system needs to write back the data to the OLTP system
- B. Only the OLAP system has a predefined subset of the data
- C. Batch process are required to keep OLTP and OLAP in sync
- D. Multiple copies of the data exist
- E. Only the OLAP system has the latest data
Answer: A,B,C,D
NEW QUESTION 53
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red Base
- B. Top of Yellow
- C. Top of Green
- D. Top of Red
Answer: C
NEW QUESTION 54
Which of the following apply to MRP Live?
There are 2 correct answers to this question.
Response:
- A. The definition of the planning scope is more flexible.
- B. Planned orders need to be converted to purchase requisitions for externally procured materials.
- C. The BAdIs for classical MRP also apply to MRP Live.
- D. The sequence of planning materials is calculated across plants.
Answer: A,D
NEW QUESTION 55
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
- A. Material master
- B. MRP profile
- C. Production scheduling profile
- D. Production version
Answer: A
NEW QUESTION 56
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning without final assembly (50)
- D. Planning with final assembly (40)
Answer: D
NEW QUESTION 57
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
- A. Processing time
- B. Floating time
- C. Queue time
- D. Tear down time
- E. Move time
Answer: B,C,E
NEW QUESTION 58
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Production supply area
- C. Replenishment strategy
- D. Rate routing
Answer: A
NEW QUESTION 59
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:
- A. Vendor consignment
- B. In-house production
- C. Subcontracting
- D. Stock transfer
Answer: B,D
NEW QUESTION 60
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements profile
- B. Consumption sequence procedure
- C. Order type
- D. Requirements type
Answer: D
NEW QUESTION 61
......
Ultimate Guide to Prepare C_TS422_1909 Certification Exam for SAP Certified Application Associate: https://www.exam4tests.com/C_TS422_1909-valid-braindumps.html