
The Most In-Demand AVIXA CTS-I Pass Guaranteed Quiz
New Version CTS-I Certificate & Helpful Exam Dumps is Online
AVIXA CTS-I - Installation Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting Pre-Installation Activities | 20% |
| Task 1: Review Audiovisual Project Documentation | 4% |
| Task 2: Conduct Technical Site Survey | 4% |
| Task 3: Prepare for Audiovisual Installation | 4% |
| Task 4: Evaluate Overall Facility Readiness | 4% |
| Task 5: Conduct On-Site Preparations for Installation | 4% |
| Duty B: Conducting Site Rough-In/First-Fix | 10% |
| Task 1: Deinstallation of Existing Equipment and cabling | 2% |
| Task 2: Mount Substructure | 4% |
| Task 3: Pull Cable | 4% |
| Duty C: Installing Audiovisual Systems | 38% |
| Task 1: Assemble AV Rack | 4% |
| Task 2: Wire the AV Equipment Rack | 5% |
| Task 3: Distribute AV Equipment | 4% |
| Task 4: Mount AV Equipment | 4% |
| Task 5: Terminate Cables | 5% |
| Task 6: Configure Network Properties of Equipment | 4% |
| Task 7: Load Configuration and Control Programs | 4% |
| Task 8: Test the AV System | 4% |
| Task 9: Calibrate the AV System | 4% |
| Duty D: Perform Systems Close Out | 11% |
| Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications | 4% |
| Task 2:Provide Training on System Operation | 4% |
| Task 3:Obtain Project Completion Sign Off from Client or Client's Representative | 3% |
| Duty E: Conducting Ongoing Project Responsibilities | 21% |
| Task 1: Complete Progress Reports | 3% |
| Task 2: Coordinate with Other Contractors | 4% |
| Task 3: Address Needed Field Modifications | 4% |
| Task 4: Repair AV Systems | 3% |
| Task 5: Maintain AV Systems | 3% |
AVIXA CTS-I Exam Certification Details:
| Exam Name | AVIXA Certified Technology Specialist - Installation (CTS-I) |
| MemberExam Price | $475(USD) |
| Passing Score | 350 / 500 |
| Schedule Exam | Pearson VUE |
| Number of Questions | 110 |
| Books / Training | Candidate Handbook |
| Non-Member Exam Price | $575(USD) |
NEW QUESTION # 163
When a transmitter or radio station creates noise in a microphone line, it is called _____.
- A. EMI
- B. a magnetic field
- C. RFI
- D. hum or buzz
Answer: C
NEW QUESTION # 164
Which sequence of numbers depicts part of a logarithmic scale?
- A. 1, 13, 26, 49
- B. 1, 2, 3, 4
- C. 1, 10, 100, 1000
- D. 1, 2, 3, 5, 8
Answer: C
NEW QUESTION # 165
A(n) _____ is a graphical representation of the microphone's directionality and electrical response characteristics.
- A. performance criteria circle graph
- B. polar plot
- C. electrical output level diagram
- D. frequency response specification chart
Answer: B
NEW QUESTION # 166
At the end of the project, once installation and verification are complete, acceptance of the completed system is documented in a commissioning report and typically signed by:
Response:
- A. The owner and/or the general contractor
- B. The systems engineer and/or the head of the legal department
- C. The contractor and/or the head of the technical staff
- D. The head technician and/or the building architect
Answer: A
NEW QUESTION # 167
Noise caused by circuit interference can be reduced by:
- A. distancing the microphone from the loudspeaker
- B. using balanced shielded twisted-pair cable
- C. extending the cable run to another room
- D. muting the microphone
Answer: B
NEW QUESTION # 168
Which of the following is a compiled program?
- A. DVD titles
- B. Control script
- C. RAW codec
- D. Machine code
Answer: D
NEW QUESTION # 169
When mounting a projector to the ceiling, one must identify the center point location of the mounting assembly, because:
- A. This is the point where the projector's weight is evenly distributed over the entire mounting plate.
- B. This is where the adjustable mount support structure must be centered.
- C. This is the center point of the projector's lens.
- D. This is the projection throw distance calculation reference point.
Answer: B
NEW QUESTION # 170
What is a ground loop?
Response:
- A. An electrically conductive area that has two or more ground reference connections
- B. An interruption of a cable shield connection
- C. A continuous isolation between receptacles and electrical circuits
- D. An electrical connection between any grounded conductor and any non-current-carrying metal object
Answer: A
NEW QUESTION # 171
What are typical applications of a distributed loudspeaker system?
Select all that apply.
Response:
- A. Public address system in an office building
- B. Background music in a restaurant
- C. Paging system at an airport
- D. Subwoofers in a concert hall
Answer: A,B,C
NEW QUESTION # 172
Which of the following statements is a true safety practice for mounting loudspeakers?
- A. If you work with a structural engineer, follow their instructions completely
- B. Attach heavy loads to a wall or ceiling surface by yourself, without a partner
- C. Nails can dependably support overhead loads
- D. You may safely exceed the working load limit without compromising the safety of the installation
Answer: A
NEW QUESTION # 173
RGBS requires _____ cables to carry the signal.
- A. three
- B. Four
- C. two
- D. five
Answer: B
NEW QUESTION # 174
Which of the following should a maintenance log include? (Choose all that apply.)
- A. Description of problem
- B. Devices replaced
- C. Name of technician
- D. Date of service
Answer: A,B,C,D
NEW QUESTION # 175
What is the point at which mains power enters a building?
- A. The main distribution board
- B. The electrical entrance
- C. The feeder
- D. The main line
Answer: A
NEW QUESTION # 176
Optical screen material is used in most _____ rear screen applications.
- A. Stationary
- B. mobile
- C. temporary
- D. permanent
Answer: D
NEW QUESTION # 177
A limitation of using the RTA method to adjust equalization is _____.
Response:
- A. that it is not legal in some jurisdictions
- B. that it cannot differentiate between high and low frequencies
- C. that an RTA is not available as a smartphone app, as PC software, or as dedicated hardware
- D. that it cannot differentiate between the direct loudspeaker sound and the interference from combined direct and reflected energy
Answer: D
NEW QUESTION # 178
A rack elevation diagram includes which of the following information?
- A. The distance from the floor the rack should be mounted
- B. Signal type for each input and output
- C. Location of electrical outlets for technical power
- D. RUs used for each component
Answer: D
NEW QUESTION # 179
Which device is used to verify signal integrity throughout a video system?
Response:
- A. A Video Optimization meter (VOM)
- B. An impedance meter
- C. An oscilloscope
- D. A volt meter to check resistance
Answer: B
NEW QUESTION # 180
What Viewing Category applies to a space used for word processing and spreadsheets?
- A. Both ADM and BDM
- B. BDM
- C. ADM
Answer: B
NEW QUESTION # 181
When mounting audio visual equipment, ASTM and SAE (ISO) bolts should have a grade (property classification) of NOT LESS THAN Response:
- A. 8 (8.8).
- B. 2 (3.6).
- C. 5 (5.6).
- D. >8 (10.9)
Answer: C
NEW QUESTION # 182
Which of the following is a form of encryption to protect copyrighted content?
Response:
- A. VESA
- B. HDCP
- C. EDID
- D. HDMI
Answer: B
NEW QUESTION # 183
A 1080p HDTV signal with a frame rate of 30Hz will reproduce images at:
- A. 30 frames per minute
- B. 30 lines per scan
- C. 30 frames per second
- D. 30 lines interlaced
Answer: C
NEW QUESTION # 184
When mounting equipment to a concrete substructure, which fastener is the most likely to be used?
- A. Toggle Bolt/Spring Toggle
- B. Self tapping screw
- C. Molly Bolt/hollow wall anchor
- D. Drop in Anchor
Answer: D
NEW QUESTION # 185
There is a conflict between the wall plate height specified in AV documents and the height the electrical contractor is saying must be used on site. Which of the following forms would be used by the integrator to seek clarification of the correct mounting height of wall plates?
Response:
- A. Construction Change Directive (CCD)
- B. Request for Information (RFI)
- C. Change Order (CO)
- D. Request for Change (RFC)
Answer: B
NEW QUESTION # 186
When evaluating a solder connection you should see:
- A. No more than two stray wires.
- B. A thick layer of solder sealing the cable jacket
- C. No lines, cracks or pits in the joint.
- D. A dull surface and a lack of shine.
Answer: C
NEW QUESTION # 187
......
CTS-I Free Certification Exam Material with 480 Q&As : https://www.exam4tests.com/CTS-I-valid-braindumps.html
UPDATED CTS-I Exam Questions Certification Test Engine to PDF: https://drive.google.com/open?id=1L2e9YkDejYdzNBaWhHcuRD9ARQyih0LC